Water Resources Application
Complete application assistance for water resources - Community Tanks (75%), Farm Ponds (50%), Borewells (50%), Flexible Tanks (50%)
- тЬУ тЬУ 4 variants: Community Tanks, Farm Ponds, Borewells, Flexible Tanks
- тЬУ тЬУ Subsidy: 75% (Community) or 50% (Others)
- тЬУ тЬУ Micro-irrigation linkage required
- тЬУ тЬУ Variant selection assistance
- тЬУ тЬУ Complete application assistance
Water Resources Application Assistance
Get complete application assistance for creation of water resources in coconut gardens. We handle variant selection, eligibility verification, document collection, application submission, and follow-up.
ЁЯТ░ Scheme Benefits (4 Variants)
Variant 1: Community Water Structures (Tanks/Ponds/Reservoirs)
Standard Areas:
- Cost Norm: тВ╣24.00 Lakh/unit (тВ╣80/cu.m)
- Subsidy: 75% of cost
- Condition: Must serve a 10-hectare command area with 30,000 cu.m capacity
NE/Hilly/Scheduled Areas:
- Cost Norm: тВ╣30.00 Lakh/unit (тВ╣100/cu.m)
- Subsidy: 75% of cost
Variant 2: Individual Farm Ponds/Tanks (Lined)
Plain Areas:
- Cost Norm: тВ╣125/cu.m
- Subsidy: 50% of cost, limited to тВ╣75,000
Hilly Areas:
- Cost Norm: тВ╣150/cu.m
- Subsidy: 50% of cost, limited to тВ╣90,000
Note: Unlined ponds get 30% less cost norm.
Variant 3: Bore Wells / Tube Wells
- Subsidy: 50% of installation cost
- Limit: Maximum тВ╣25,000 per unit
Variant 4: Flexible Water Storage Tanks (Polythene/Canvas)
Applicability: Only for North East, Hilly States, Andaman & Nicobar, Lakshadweep
- Cost Norm: тВ╣0.80 per liter
- Subsidy: 50% of cost
- Limit: Max capacity 50,000 liters per beneficiary
тЬЕ Eligibility Criteria
Who Can Apply:
- Farmers with coconut gardens requiring irrigation
- Community organizations (for Community Tanks)
Key Condition:
- Micro Irrigation Linkage: Must be linked with Micro Irrigation (Drip/Sprinkler) facilities (mandatory)
- Borewells: Not allowed in critical/over-exploited groundwater zones
- Maintenance: Responsibility of beneficiary/community
тЪая╕П Important Conditions
Micro Irrigation Linkage:
- All water resources must be linked with Drip/Sprinkler facilities
- This condition is mandatory
Borewell Restrictions:
- Borewells not allowed in critical/over-exploited groundwater zones
- Groundwater zone verification required
Maintenance:
- Maintenance of water resources is responsibility of beneficiary/community
- Regular maintenance and repairs required
Technical Specifications:
- Specific technical specifications required for each variant
- Technical estimates and cost breakdown required
Our Service
We help you with the complete application process for water resources scheme:
- Variant Selection - Help select the right water resource variant based on your needs
- Eligibility Verification - Verify land, micro-irrigation linkage, groundwater zone
- Document Collection - Help gather all required documents (land papers, technical estimates, micro-irrigation proof)
- Technical Specifications - Help prepare technical estimates and cost breakdown
- Application Submission - Submit application form with technical specifications
- Follow-up - Track application status and assist with any queries
ЁЯУД Documents Required
- Land ownership documents
- Micro-irrigation linkage proof (Drip/Sprinkler)
- Technical estimates and cost breakdown
- Aadhaar & Bank Passbook
- Site photos and location details
- Groundwater zone certificate (for Borewells)
ЁЯУК Detailed Scheme Information
Variant 1: Community Water Structures
Standard Areas:
- Cost Norm: тВ╣24.00 Lakh/unit (тВ╣80/cu.m)
- Subsidy: 75%
- Command Area: 10 hectares
- Capacity: 30,000 cu.m
NE/Hilly/Scheduled:
- Cost Norm: тВ╣30.00 Lakh/unit (тВ╣100/cu.m)
- Subsidy: 75%
Variant 2: Individual Farm Ponds
Plain:
- Cost Norm: тВ╣125/cu.m
- Subsidy: 50%, Max тВ╣75,000
Hilly:
- Cost Norm: тВ╣150/cu.m
- Subsidy: 50%, Max тВ╣90,000
Unlined: 30% less cost norm
Variant 3: Borewells/Tube Wells
- Subsidy: 50% installation cost
- Limit: тВ╣25,000/unit
- Restriction: Not allowed in critical/over-exploited groundwater zones
Variant 4: Flexible Tanks (NE/Hilly Only)
- Cost Norm: тВ╣0.80/liter
- Subsidy: 50%
- Limit: 50,000 liters/beneficiary
ЁЯУЛ Technical Details & Legal Information
Micro Irrigation Linkage
- All water resources must be linked with Drip/Sprinkler facilities
- This condition is mandatory and verification required
Groundwater Zone Restrictions
- Groundwater zone verification required for Borewells
- Not allowed in critical/over-exploited zones
- Groundwater zone certificate required
Maintenance Responsibility
- Maintenance of water resources is responsibility of beneficiary/community
- Regular maintenance and repairs required
- Maintenance reports may be required
MIDH/PMKSY Norms
- Scheme aligned with MIDH/PMKSY norms
- Technical specifications must be as per MIDH/PMKSY norms
Prefer a form? Use our secure request form and weтАЩll reply on WhatsApp right away.
Documents Required
- ЁЯУД Land ownership documents
- ЁЯУД Micro-irrigation linkage proof (Drip/Sprinkler)
- ЁЯУД Technical estimates and cost breakdown
- ЁЯУД Aadhaar & Bank Passbook
- ЁЯУД Site photos and location details
- ЁЯУД Groundwater zone certificate (for Borewells)
ЁЯОп Select Project Type
Select Processing Speed
Secure payment via Razorpay тАв 100% Money Back Guarantee
Volume Discounts
Buy 7+ Water Resources Application & save 20%
- 2-3 items 10% OFF
- 4-6 items 15% OFF
- 7+ items 20% OFF